Air emissions software: trace the input behind each reported result
A monthly emissions total changes after an activity correction and an emission-factor update. Elsewhere in the same reporting pack, a monitoring period is missing. Can your reviewer explain the changed estimate, reproduce the earlier result and see that the monitoring gap remains unresolved? Use those questions to compare air emissions software.
Jump to the 6 productsEditorial responsibility: Dimitris Mitsios (Founder of The QHSE Standard; product marketing at Tekmon) · Tekmon pays for sponsored placements on this site (disclosure) · How pages are made · LinkedIn
Sources checked 21 September 2026. Product descriptions below establish documented scope; the exercises are proposed acceptance tests, not hands-on product results. Existing profiles retain their separately dated pricing and connectivity evidence. Evaluation methodology.
TekmonAd
Explore its published safety, quality and maintenance workflows. Confirm modules and pricing in a scoped proposal.
Separate the records behind an emissions report
| Buying scope | Record to inspect | Boundary to confirm |
|---|---|---|
| Continuous source monitoring | Instrument or historian data, timestamps, units and quality flags | A connection or dashboard does not by itself establish monitoring-system quality or treatment of unavailable data. |
| Calculated emissions inventory | Activity, equation, factor source/version, assumptions and calculation result | An estimate is not automatically a measured result or an approved replacement for missing monitoring data. |
| Ambient air programme | Monitoring location, observation period, method and concentration | An ambient concentration is a different record from a source's emitted mass or emission rate. |
| Leak detection and repair (LDAR) | Identified component, survey result, repair and follow-up history | An inventory line for fugitive emissions does not establish the field inspection and repair workflow. |
| Review and reporting | Reporting basis, included records, reviewer decision and issued revision | A generated file does not establish acceptance by the recipient or compliance with every applicable requirement. |
Documented air emissions application scopes
Use the named application in the proposal. A broader EHS or sustainability subscription does not establish which monitoring connections, calculation models or reporting services are included.
A card can be admitted by an inventory calculation module, a fugitive-emissions survey workflow or a product that names air alongside water and waste reporting. These are different purchases, so read the capability printed on each card before comparing two of them.
The cards open existing broader product profiles. Their prices, offline fields and evidence dates do not describe an equivalent air emissions package or establish that monitoring hardware is included.
Ordered by how closely our sources document this process, not by quality. Sponsored placements are labelled. How lists are ordered
Same rule for every product: tagged “Environmental Management” or “Environmental Monitoring” or assigned primary category “Environmental Management” or “EHS Management”, with a sourced air emissions capability in its record, or one the vendor stated to us, labelled as vendor-stated. 6 qualify.
ERA-EHS
Documented: Air emissions modelling and reporting. Source: era-environmental.com
Sphera
SpheraCloud Air/GHG Emissions Management: Inventory calculations and their underlying inputs. Sphera describes visual calculation expressions, operational-data imports, customer-defined data-quality rules and trails from collection to disclosure. Start here when reviewers need to trace an inventory result to its inputs and see the effect of a correction. Verify in the demo: Demonstrate effective dates, historical factor versions and the exact recalculation/review workflow. The reviewed page does not establish every CEMS connector or a complete leak-detection programme. Source: sphera.com
VelocityEHS
VelocityEHS Air Emissions: CEMS data logging alongside calculations and models. VelocityEHS explicitly describes CEMS logging, OSIsoft PI integration, equation libraries, customizable exports and potential-to-emit modelling. Start here when the buying brief includes connecting an existing monitoring or historian environment to reporting. Verify in the demo: Confirm the supported PI/monitoring setup, data-quality flags and ownership of each calculation. Show actual emissions and theoretical scenarios separately. The named integration does not establish compatibility with every instrument or regulatory submission. Source: ehs.com
Lisam
Documented: Environmental calculations and regulatory reporting (conditional). Source: lisam.com
Metegrity Visions Enterprise
Documented: Fugitive-emissions and LDAR workflow (conditional). Source: metegrity.com
Ecesis
Documented: Environmental modules such as SPCC and stormwater (conditional). Source: ecesis.net
Demo case: explain two revisions without hiding a monitoring gap
Use fictional records for a software demonstration. CALC-017 estimates an invented pollutant P for a material-processing activity. ACT-017 revision 1 records 100 tonnes of material; the invented EF-DEMO-017 version 1 is 0.20 kg P per tonne of material. The estimate is 20 kg P. Save the inputs, calculation and reviewed report RPT-017 revision 1.
Correct the activity to 120 tonnes in ACT-017 revision 2, retaining the original record and reason. With factor version 1, the estimate becomes 24 kg P. Next, introduce invented factor version 2 at 0.25 kg P per tonne and explicitly select it for a new demonstration calculation: 30 kg P. Record the selected reporting period and review decision; introducing a new factor must not silently rewrite historical calculations.
A separate monitored source in this reporting pack has no available values for 10:00–11:00 on the synthetic reporting day, recorded as MON-017. Keep that interval visible and assign the applicable programme's review. None of the inventory estimates above fills this gap. Do not enter zero, interpolate or substitute a factor calculation merely to complete the dashboard.
Prepare RPT-017 revision 2 as a draft containing the revised estimate and the unresolved monitoring issue. Compare it with the earlier reviewed report, show which inputs changed and demonstrate the configured approval path. Whether and how a reporting pack can be issued with unavailable data must follow the applicable reporting basis; this exercise supplies no missing-data method or submission decision.
Reproduce every version of the synthetic calculation
| Synthetic record | Inputs or status | Result and review evidence |
|---|---|---|
| CALC-017 revision 1 | ACT-017 r1: 100 t × EF-DEMO-017 v1: 0.20 kg P/t | 20 kg P; retained as the calculation behind reviewed RPT-017 revision 1. |
| CALC-017 revision 2 | ACT-017 r2: 120 t × EF-DEMO-017 v1: 0.20 kg P/t | 24 kg P; activity correction, supporting file, reason and reviewer history. |
| CALC-017 revision 3 | ACT-017 r2: 120 t × EF-DEMO-017 v2: 0.25 kg P/t | 30 kg P; selected factor version, reporting period and review of its applicability. |
| MON-017 / separate monitored source | No available values for 10:00–11:00 | An unresolved data gap, source/quality context and assigned review; no invented observed value. |
| RPT-017 revision 1 → revision 2 | Reviewed earlier pack → new draft with 30 kg P estimate | Both report versions, the changed calculation references and the monitoring issue's visible status. |
Specify monitoring, inventory and LDAR scope separately
EPA's CEMS overview describes the equipment and processing used to determine concentration or emission rate, with performance and quality-assurance requirements tied to applicable rules. In the purchase brief, identify who owns the instruments, data acquisition, historian and reporting calculation. A software connector establishes only one part of that chain.
EPA describes an emission factor as a representative relationship between an activity and pollutant emissions. For an inventory calculation, ask to retain the factor's source, units, version, applicability and any control assumptions. The numerical factors in this guide are invented for revision testing and are not factors for operational use.
EPA's monitoring introduction distinguishes ambient-air observations from stationary-source monitoring. Its LDAR guide overview concerns equipment leaks and a defined monitoring/repair programme. Request separate demonstrations for ambient monitoring, component surveys and repairs if those are in scope; the vendor pages cited in this guide do not establish every such workflow.
For any connected feed, test late delivery, rejected units, duplicate records, quality flags and a lost connection. Retain observation time and receipt time. Ask the responsible specialist to define any permitted missing-data treatment and its documentation; a generic import rule must not become an undocumented scientific or regulatory assumption.
Check the reporting basis before accepting an export
Ask the vendor to show one source, pollutant, reporting period and method all the way to the proposed output. Retain units, conversions, time zone, averaging or aggregation rules, included records and the reviewer. Keep measured, estimated and theoretical results distinguishable, and show how the configuration avoids counting the same source twice.
Then change one input after review. Identify affected calculations and reports, preserve the issued version, and show who decides whether a revision is required. A successful export or upload should have its own recorded status; it must not silently convert a draft calculation into a reviewed result or a file transfer into recipient acceptance.
If the main need is field samples and laboratory amendments, use the Environmental Data Management guide. For corporate GHG consolidation, continue to Carbon Accounting and confirm the reporting boundary and method separately.
Six demonstrations before choosing air emissions software
Trace one imported observation
Identify its source, pollutant, units, observation time, receipt time and quality flag. Introduce a duplicate and an invalid unit to demonstrate the configured review path.
Leave missing monitoring data visible
Show MON-017's unavailable interval, responsibility and reporting impact. Demonstrate how any applicable treatment is documented separately from the original missing record.
Correct activity without losing the original
Change ACT-017 from 100 to 120 tonnes. Reproduce the 20 kg P and 24 kg P estimates and retain the correction reason and supporting evidence.
Select and review a factor version
Introduce the invented 0.25 kg P/t factor and calculate 30 kg P. Show the chosen period, applicability decision and retained earlier calculations.
Create a report revision for review
Compare RPT-017 revision 2 with revision 1. Keep the missing monitoring issue visible and distinguish draft, reviewed, issued and received states where required.
Export the supporting record
Deliver inputs, units, factor versions, calculation logic, quality flags, decisions and report history. Identify any monitoring, LDAR or ambient-air connections that require separate scope.
Put the data and reporting responsibilities in the quote
Build the shortlist around your reporting records
Use the environmental category to explore broader platforms, then ask for the named air emissions application and the complete source-to-report demonstration.
Browse Environmental Management applicationsSources and limits of this guide
7 sources
- Cority: Air Emissions Management
- Sphera: Air/GHG Emissions Management
- VelocityEHS: Air Emissions application
- US EPA: continuous emission monitoring systems
- US EPA: emissions factors and quantification
- US EPA: ambient and stationary-source monitoring
- US EPA: Leak Detection and Repair guide overview
Vendor pages establish documented application scope. EPA material supplies US technical context, not a universal reporting obligation or a site-specific method. The records, pollutant and factors in the exercise are fictional. No emissions limit, missing-data substitution, factor selection for actual operations or regulatory acceptance is prescribed.
Software categories to explore
Use this Process to define the work, then explore these software types. Confirm the exact workflow and module with each vendor.
See all software categoriesRelated Guides
More related guides
- Construction Fleet Emissions Software: Follow the Litre
Software guide on construction fleet emissions.
- GHG Scope 1, 2 and 3 — definition, software & FAQs
Definition of GHG Scope 1, 2 and 3.
- Carbon Footprint Scenario Calculator — Your Quantities and Factors
Calculator for a Scope 1 and 2 carbon footprint.
- GHG Protocol — definition, software & FAQs
Definition of the GHG Protocol.
- PCAF (Partnership for Carbon Accounting Financials) — definition, software & FAQs
Definition of PCAF.




