Oil & Gas QHSE Software: Compare the Application, Then the Proposal
Start with the record, its owner and the decision it supports, then choose candidates for the workflow you need to complete. A field inspection, a work authorisation, an exposure record and an environmental report can refer to the same asset while needing different applications, permissions and acceptance evidence. The rule-based product list below illustrates those boundaries; it is not a performance ranking or a set of interchangeable packages.
Jump to the 24 productsEditorial responsibility: Dimitris Mitsios (Founder of The QHSE Standard; product marketing at Tekmon) · Tekmon pays for sponsored placements on this site (disclosure) · How pages are made · LinkedIn
Selected official product pages checked 20 September 2026; the regulatory map was checked against the linked legal texts on 24 September 2026. Profile pricing and connectivity details retain their own review dates.
On this page (8 sections)
Candidates by the application to investigate
A field inspection, a work authorisation, an exposure record and an environmental report can refer to the same asset while needing different applications. For each product, name the application, the record it owns and the acceptance evidence before shortlisting.
Tekmon pays for a sponsored placement (above); its place in this list follows the same rule as every entry. How lists are ordered
Same rule for every product: tagged “Permit to Work”, “Permits to Work (PTW)”, “Control of Work”, “Process Safety”, “Barrier Management”, “Asset Integrity” or “Industrial Hygiene”, with a sourced work-control or process-safety capability in its record, or one the vendor stated to us, labelled as vendor-stated. 24 qualify; the first 8 are shown, then the other 16.
Safetymint
Documented: Control-of-work linkage (conditional). Source: safetymint.com
Sitemate
Documented: Hot works permit system. Source: sitemate.com
Haz360
Documented: Safety-asset database and lifecycle handoff (conditional). Source: irescglobal.com
IAMTech iPermit
Documented: Isolation and LOTO control. Source: go.iamtech.com
BowTieXP
Documented: Barrier attributes, accountability and supporting activities. Source: wolterskluwer.com
GOARC
Documented: Isolation lifecycle. Source: go-arc.com
Pisys Permit to Work
Documented: Isolations. Source: pisys.co.uk
Prometheus Group
Documented: Electronic permit-to-work workflows. Source: prometheusgroup.com
Give each relevant candidate the same evaluation brief
Use exceptions to reveal the application boundary
| Demo task | Evidence to retain | Keep unresolved when… |
|---|---|---|
| Change a work-package revision | Who sees the change, which linked records update and which approvals require review. | The change is described verbally or demonstrated in an unquoted application. |
| Change the assigned reviewer at handover | Role permissions, ownership history and the status visible to each participant. | Responsibility disappears between teams or depends on an undocumented workaround. |
| Interrupt a required field task | Preparation, available information, queued records and receipt after reconnection. | Mobile access is presented as proof of every offline task or current server state. |
| Correct a source record used elsewhere | The original value, correction, reviewer and downstream effect. | An integration transfers data but the team cannot reconcile identifiers or failed messages. |
| Export a completed record | Linked IDs, attachments, changes and the decisions the reviewer needs to reconstruct. | The export is unavailable in the proposed plan or its contents cannot be inspected. |
Keep a pending decision visible
Illustrative result: a candidate demonstrates work-package creation and a handover, but the required disconnected task is only promised. Record the first two results as demonstrated and the third as untested. If that task is essential, retain a pending decision until it is tested in the proposed application and configuration.
For the work-control parts of the demo, use a simulated scenario approved by the site's responsible specialists. Their operating procedures define who may authorise real work. A software screen, a successful upload or a vendor demonstration is not an operational authorisation.
These are editorial acceptance exercises based on the purchasing questions above. No hands-on product comparison, comparative safety result or customer interview was performed for this guide.
Compare complete scope instead of a generic price band
Map each workflow to the rule behind its record
Name the legal requirement a record has to evidence before asking which application holds it. The texts below were checked on 24 September 2026; applicability depends on the process, the substances and the jurisdiction, so have the responsible specialists confirm it.
- 29 CFR 1910.119 (US process safety management): Covered processes need process safety information (d), process hazard analysis (e), contractor controls (h), mechanical integrity (j), a hot work permit (k) and written management-of-change procedures (l). Ask which application holds each record and how an open PHA recommendation or MOC action is carried into the pre-startup safety review.
- 29 CFR 1910.146 (US permit-required confined spaces): Sets the entry-permit contents, including test results with the tester and time, and any additional permits such as hot work issued for the same space.
- 29 CFR 1910.147 (US control of hazardous energy): The general-industry lockout/tagout standard does not cover oil and gas well drilling and servicing, so confirm which isolation rule applies to each work type before configuring one isolation record for all of them.
- 40 CFR part 68 (US EPA Risk Management Program): EPA amended the programme in the 2024 Safer Communities by Chemical Accident Prevention rule (89 FR 17622) and proposed revisions to several of those provisions, including third-party audits, on 24 February 2026 (91 FR 8970). Check the current text before configuring audit or investigation workflows around it.
- Directive 2012/18/EU (Seveso III): EU establishments above its thresholds keep a major-accident prevention policy, and upper-tier establishments a safety report; Great Britain applies the regime through the COMAH Regulations 2015.
- COMAH Regulations 2015 (Great Britain): The Control of Major Accident Hazards Regulations 2015 implement the Seveso III regime in Great Britain.
What the sources establish
The linked pages establish advertised application scope. They do not prove inclusion in a particular contract, suitability for an asset, implementation speed, connectivity under site conditions or compliance with every applicable requirement.
HSE's HSG250 permit-to-work guidance describes a permit system in the context of planning, competence, risk assessment and review. It is a 2005 publication for the petroleum, chemical and allied industries; its page was checked on 20 September 2026. It does not specify the software scenarios or vendor selection criteria on this page.
Source selection and interpretation follow the editorial methodology. Use the worked quote comparison to separate recurring fees, one-off services and internal effort.
Take the brief into a recorded demo
Select candidates that address the same primary requirement, then record the application, observed evidence and remaining gaps for each.
Open the demo scorecardMore related guides
- UK COMAH 2026: What Operators Should Build, Not Just Record
Article on UK COMAH compliance for operators.
- ATEX — definition, software & FAQs
Definition of ATEX.
- Lockout/Tagout (LOTO): Paper to Digital Energy Isolation
Article on moving lockout/tagout from paper to digital.