Construction QHSE Software: Compare Scope and Run a Demo
Compare the proposed package against your projects, external workers and record handoffs. This guide helps procurement teams, including smaller contractors, separate documented product scope from configuration, integration and operational assumptions before agreeing a pilot, and follows one frontline hazard report from capture to verified closure.
Jump to the 15 productsEditorial responsibility: Dimitris Mitsios (Founder of The QHSE Standard; product marketing at Tekmon) · Tekmon pays for sponsored placements on this site (disclosure) · How pages are made · LinkedIn
Official product and support pages, plus the HSE and OSHA guidance cited below, reviewed 19 September 2026. Scenarios are editorial evaluation suggestions, not performance rankings or hands-on test results. OSHA references concern the United States and HSE references concern Great Britain; apply the requirements for your own site.
Worked example: an inspection that reaches verified closure
Illustrative buyer brief, not a customer case study: a contractor runs three projects with six supervisors, one QHSE administrator and twelve subcontractor companies. A site inspection finds damaged equipment; the supervisor records it, the subcontractor proposes a correction, and an authorised reviewer rejects or accepts the evidence.
The first release covers inspection capture, assignment, review and export. Worker onboarding, permit authorisation and payroll are separate requirements. Agree the operational response to a defect outside this software exercise; a submitted form is not permission to use equipment.
- Bring a redacted inspection template, two photos and a sample project/asset register.
- Use separate supervisor, subcontractor and reviewer accounts. Test that an external user cannot read another company's records.
- Record the current time needed to retrieve a closed issue and reconcile field records with the office. Compare the same tasks in the pilot.
- Ask each vendor to quote all three projects and the same roles, stating how occasional external users are licensed.
Build a shortlist around the next decision
For this inspection-to-action example, invite products from the list below to demonstrate the same record handoff. The list follows one published rule; it is not a ranking or a claim that any product meets the acceptance criteria.
Choose by the next decision: project and subcontractor coordination, inspection-led field capture or crew documentation. Do not extend an inspection app's offline claims to every platform workflow; verify the offline steps individually and identify anything requiring a connection. If a project-management platform is already deployed, check its existing safety package before purchasing a second system.
Open a scorecard for the first listed productsThe link selects the vendors. Add the project requirements yourself; no observed results or scores are prefilled.
Keep responsibilities outside the software promise
For Great Britain, HSE's contractor guidance under CDM 2015 covers planning, managing and monitoring work, checking worker capability and providing site-specific induction. Where several contractors are involved, coordination matters; a single contractor must arrange the construction phase plan before site setup. Other jurisdictions need their own applicability review. Great Britain HSE: contractor responsibilities under CDM 2015
Use those responsibilities to define owners and evidence in the system. A template labelled CDM, an uploaded RAMS document, a digital signature or a completed checklist is not proof that the underlying work has been planned and controlled adequately, that a permit is valid or that certification has been achieved.
Map CDM 2015 duty holders to their records
For projects in Great Britain, each duty holder under the Great Britain: Construction (Design and Management) Regulations 2015 owns different records. Assign each record to a named role in the system before the pilot, and check that a subcontractor's user cannot close a record the principal contractor owns.
| Duty holder | What the regulations require | Records to assign an owner |
|---|---|---|
| Client (regulations 4 and 6) | Makes suitable arrangements for managing the project, including sufficient time and resources. Gives written notice to HSE when work is scheduled to last longer than 30 working days with more than 20 workers at any one time, or to exceed 500 person days. | Notification record, appointment records and the pre-construction information supplied |
| Principal designer (regulations 11 and 12) | Plans, manages, monitors and coordinates the pre-construction phase, gives the principal contractor the information relevant to the construction phase plan, and prepares the health and safety file. | Design risk information and a health and safety file that is kept up to date |
| Principal contractor (regulations 12 to 14) | Draws up the construction phase plan before the site is set up and keeps it under review; plans, manages, monitors and coordinates the construction phase; ensures a suitable site induction and prevents unauthorised access; and makes arrangements to consult and engage with workers. | Construction phase plan versions, inductions, site access and worker consultation |
| Contractor (regulation 15) | Does not start work unless satisfied that the client is aware of its duties, and plans, manages and monitors the work of its own workers. | Contractor RAMS, competence evidence and supervision of its own workers |
Regulations checked 24 September 2026. The table summarises the duties; it does not replace the regulations, HSE guidance or a competent assessment of who holds each role on your project.
Write a project-level scope brief
Construction products to test against the brief
Each entry states what its researched record documents; the table compares offline scope and published commercial conditions, which describe different licensing models and are not interchangeable package prices.
Tekmon pays for a sponsored placement (above); its place in this list follows the same rule as every entry. How lists are ordered
Same rule for every product: tagged “Construction Safety”, “Construction Compliance”, “Contractor Management”, “Site Induction”, “Drawing-Linked Tasks” or “EHS”, with a sourced construction project, subcontractor, induction or orientation capability in its record, or one the vendor stated to us, labelled as vendor-stated. 15 qualify; the first 8 are shown, then the other 7.
Fieldwire by Hilti
Documented entry point: Drawing-linked tasks. Demo task: issue a revised drawing after a linked task is assigned and identify every user or record still carrying the superseded version. Source: fieldwire.com
Raken
Documented entry point: Daily field reports. Demo task: correct a signed daily report, retain the earlier version and retrieve both after the project is archived. Source: help.rakenapp.com
Assignar
Documented entry point: Qualification and expiry tracking. Demo task: expire one contractor credential and show whether site access, assigned work and the reviewer exception remain distinguishable. Source: assignar.com
ComplyWorks
Documented entry point: Orientations, onboarding and training distribution. Demo task: reject an incomplete induction, resubmit the missing evidence and show which role can approve site access. Source: veriforce.ca
Salus
Documented entry point: Orientations, training, subcontractor readiness and Trust Portal. Demo task: reject an incomplete induction, resubmit the missing evidence and show which role can approve site access. Source: salussafety.io
MRI OnLocation
Documented entry point: Contractor profiles, inductions and eLearning. Demo task: reject an incomplete induction, resubmit the missing evidence and show which role can approve site access. Source: mrisoftware.com
SaferMe
Documented entry point: Site sign-in and inductions. Demo task: reject an incomplete induction, resubmit the missing evidence and show which role can approve site access. Source: safer.me
Sitemate
Documented entry point: Permit template creation and PDF markup. Demo task: issue a revised drawing after a linked task is assigned and identify every user or record still carrying the superseded version. Source: help.sitemate.com
Also meet the rule, in the same order (7)
| Product | Published price | Free trial | Offline workflow |
|---|---|---|---|
| Fieldwire by Hilti | Yes | Limited 14-day Business beta trial for eligible new US/Canada accounts; availability not guaranteed | Partial |
| Raken | No | Free trial documented | Partial |
| Assignar | No | Not established | Partial |
| ComplyWorks | No | Not established | Not classified |
| Salus | No | Trial or demo on request | Not classified |
Status labels from each profile's sourced record; open the profile for the evidence and dates.
The table shows the first 5 products of the list, in the same order; every profile carries the same fields.
Scenarios for smaller contractors
For a small contractor, the useful starting point is the task that breaks down on site: a missing check, a late induction or a briefing the office cannot find. Choose one complete workflow, identify everyone involved and test it with the devices and connectivity your crews actually use. No single employee threshold determines fit.
Each product note in the list above carries a demo task. Give each candidate the same site-check form, crew and document revision: capture a defect, assign follow-up, collect the required signatures, disconnect and reconnect the device, then retrieve the completed record in the office. Record any manual handoff or unavailable step. Already using a project-management platform? Check its existing safety entitlement before introducing another tool.
Prepare a demo scorecard for the first listed productsFollow a hazard report from capture to verified closure
A hazard report is useful when it reaches someone able to act, the response is checked and the crew knows what happened. US OSHA's recommended practices encourage workers to report hazards and near misses, with prompt responses and participation that is not discouraged by retaliation. These are US program recommendations, not a universal software specification. US OSHA: worker participation
OSHA also encourages investigation of incidents and close calls to identify underlying hazards and program shortcomings, and in Great Britain HSE's construction guidance emphasises checking that health-risk controls work. Logging an event and marking a task complete are therefore different evaluation questions. US OSHA: incident investigation; Great Britain HSE: reviewing construction health-risk controls
- Capture the location, task, concern and evidence, including how a worker without a personal company device or account would report it.
- Confirm receipt and the reviewing role; a locally queued report must remain distinguishable from one received by the office, and urgent concerns use the site's immediate reporting procedure.
- Record the assessment, action, owner and due date, then test reassignment when the named supervisor is unavailable.
- Have a reviewer reject an inadequate response and record the basis for closure, preserving the original report.
- Show feedback to the reporter while keeping personal information appropriately restricted.
OSHA's program-evaluation guidance includes worker participation, reported hazards and timely corrective actions among possible indicators; use them as starting points for locally agreed measures. A low report count alone is not evidence of a safer site, and this guide establishes no percentage reduction in incidents. An internal software record does not itself make any required notification to a regulator. US OSHA: program evaluation and improvement
Run one project scenario in every demonstration
Prepare the same evidence
Bring a sample work package, two instruction revisions, a worker with a missing record and an equipment defect. Use realistic supervisor, subcontractor and client-reviewer roles.
Change the task
Update the instruction after the initial briefing. Show who sees the old version, who reviews the change and how the crew is re-briefed. Demonstrate any required authorisation rather than describing a future configuration.
Disconnect and recover
Prepare the device, disconnect, capture the inspection and attach evidence. Reconnect and verify office receipt, timestamps, duplicates and rejected uploads. Test approvals separately from form entry.
Reject and close
Reject the first proposed correction, reassign it and accept the second. Retrieve the full history with the intended reviewer permissions and export the record and attachments.
Record evidence instead of assigning an invented score
| Result | What to record |
|---|---|
| Demonstrated | Completed with the intended role and retained evidence |
| Conditional | Required module, configuration, integration or device preparation |
| Gap | Unavailable step, workaround, owner and agreed response |
| Commercial dependency | Written inclusion, licence basis and delivery acceptance requirement |
Request comparable quotes and pilot terms
Agree pilot acceptance before selecting a winner
| Gate | Evidence to retain | Decision owner |
|---|---|---|
| Capture and reconciliation | Complete the agreed sample records with prepared devices; reconcile each record and attachment after reconnecting. Investigate every missing or duplicate record. | Site supervisor + QHSE administrator |
| Review and permissions | Reject the first correction, resubmit and accept it. Retain actor, timestamp and reason; test permitted and forbidden external access. | QHSE reviewer + IT |
| Retrieval and exit | Export one complete issue history with readable attachments. Have a colleague retrieve it without the original submitter's help. | Records owner |
| Commercial scope | Written inclusion of users, projects, configuration, training, support and export. Assign an owner and deadline to each unresolved dependency. | Procurement |
Write a decision that survives the demo
For each requirement, record demonstrated evidence, a conditional dependency, a gap or not tested. Keep a separate note for the proposed configuration and the result actually observed. Agree retrieval-time and effort targets against your own baseline before the pilot; this guide provides no universal pass score.
Proceed when the mandatory gates have evidence and the proposal matches the tested package. Extend the pilot when an important step remains untested. Remove a candidate when a mandatory gap has no acceptable response. Record the reason, reviewer and date, then use the RFP template to carry unresolved requirements into procurement.
Sources and review boundaries
14 sources
- Mitti offline feature boundaries
- HammerTech construction platform
- HammerTech Inspect
- SiteDocs offline preparation
- Tekmon audits and inspections
- HammerTech pricing and core inclusions
- HammerTech orientation review and approval
- Great Britain HSE: contractor responsibilities under CDM 2015
- US OSHA: worker participation
- US OSHA: incident investigation
- Great Britain HSE: reviewing construction health-risk controls
- US OSHA: program evaluation and improvement
- SiteDocs multiple worker signatures
- Great Britain: Construction (Design and Management) Regulations 2015
Product documentation establishes advertised functionality, not contractual inclusion, legal compliance or a verified safety outcome. Current profile pages provide the broader research and pricing context. Workflow and demo steps are editorial evaluation examples, not prescribed technical control measures or proof of compliance.
Take the scenarios into a recorded evaluation
Capture demonstrated steps, dependencies and gaps using the same project brief for each candidate.
Prepare the demo scorecardMore related guides
- CDM Regulations — definition, software & FAQs
Definition of the CDM Regulations.
- Fall Protection Software: Equipment, Anchors and Competence
Software guide on fall protection.
- HammerTech vs Procore Quality & Safety | Scope & Demo Questions
Head-to-head comparison of HammerTech and Procore Quality & Safety.
- OSHA Focus Four 2026: Preventing Construction Fatalities
Article on the OSHA Focus Four.
- Contractor Safety Software: Evaluation Guide
Evaluation brief on contractor safety software.