    HSI Donesafe is a candidate for teams replacing separate reporting forms and follow-up registers. Its modular approach supports a staged rollout, with no-code configuration and documented offline capture. Buyers should assess both frontline usability and the administrative work needed to maintain the configuration.

    HSI Donesafe price on record: Subscription, contact vendor · No amount published · Pricing checked · See pricing

    Evidence: Researched profile

    Built from vendor sources checked ; AI-assisted drafting. Documentation review, not a hands-on test. How pages are made

    EHS Management

    Who is HSI Donesafe for?

    Organizations needing adaptable safety workflows and a staged module rollout across workers and contractors. Configuration flexibility needs a named internal owner. Validate the purchased modules, contributor population and disconnected workflow before comparing total cost.

    Worth shortlisting when configurable workflows would replace several disconnected safety processes. Start with the modules needed for a specific reporting-to-resolution workflow and compare configuration and support costs with the administration saved.

    Watch for: Numeric pricing and currency are not public on the reviewed page. Configuration ownership and maintenance need planning. Offline conflicts and attachment limits need a practical demo.

    Sources checked .

    Product tour

    Vendor visuals—not a QHSEtech hands-on test.

    Donesafe form with contributing-factor fields and a 5x5 likelihood by seriousness matrix, outcome Low, score 4

    Psychosocial incident form: risk assessment matrix

    Source
    Donesafe survey form: wellbeing, co-worker relationship, feeling valued and stress questions, comments box

    Psychosocial module: wellbeing survey form

    Source

    Incident management platform overview

    Official HSI Donesafe product video embedded on the vendor's incident-management page. It illustrates vendor-selected product scope, not a QHSEtech hands-on test; confirm that the shown workflow and modules match the proposal.

    Open official source

    Capabilities and scope

    HSI Donesafe is a configurable EHSQ platform sold with selected application modules. A module shown in the catalog should not be assumed to be included in every subscription. HSI announced its acquisition of Donesafe on 4 February 2020, and Donesafe uses the HSI Donesafe name. These listings share ownership; confirm the product, modules and contract rather than treating the names as independent vendors or identical subscriptions. Donesafe's company page also states that Donesafe is part of the HSI family.

    HSI Donesafe capabilities, evidence status and source links
    CapabilityEvidenceScope and source
    Quality and supplier managementDocumented by vendor

    The quality offering names quality events, supplier performance, document control, nonconformance investigation, root-cause analysis, CAPA, audits and action verification. The NCR module connects complaints, defects and incidents to investigation and closed-loop CAPA; confirm the selected modules and mandatory reviewer separation in the proposal.

    Quality and supplier management scope — checked 28 September 2026Non-conformance investigation and closed-loop CAPA — checked 28 September 2026
    Configurable hazard formsDocumented by vendor

    Conditional fields and prefilled context support tailored hazard capture.

    Hazard management
    Corrective follow-upDocumented by vendor

    Hazard workflows can assign actions and notify responsible workers.

    Hazard management
    Offline captureDocumented by vendor

    The incident module and offline application document incident, hazard, audit, form and checklist use while offline. Synchronization is documented; conflict and attachment behavior still require verification.

    Incident workflow, investigation reviews and OSHA logsOffline application and sync
    Incident investigation and action reviewDocumented by vendor

    The incident module describes triage, RCA, 5 Whys and ICAM, followed by Investigation Review, Corrective Actions, Actions Review and Complete. These stages are configurable; demonstrate reviewer separation and rejection rules in the proposed workflow.

    Incident workflow, investigation reviews and OSHA logs
    OSHA recordkeeping outputsDocumented by vendor

    The incident module names OSHA 300, 301 and 300A logs for the United States. Confirm current fields, establishment logic, electronic-submission responsibility and the exact export before relying on them.

    Incident workflow, investigation reviews and OSHA logs
    Contractor onboardingDocumented by vendor

    Self-registration, qualification records, task- or site-specific inductions, digital sign-off, certificates, expiry notifications and site-entry linkage are described. Contractor and induction modules are separate scope; these controls do not establish fulfilment of CDM duties.

    Contractor managementStaff and contractor inductions, including offline access — checked 27 September 2026
    Modular deploymentDepends on scope

    Modules can be selected and connected progressively. Verify the purchased set. The pricing page refers to 50+ modules and the modular platform page to 60+; confirm the count and the named modules in the order.

    Modular platform
    Role-specific visibilityDocumented by vendor

    The platform describes adaptive dashboards and reporting across configured use cases.

    Platform capabilities and integration
    System integrationDepends on scope

    RESTful API and staging options such as SFTP support live and batch exchange. Confirm access and implementation costs.

    Platform capabilities and integration
    First aid, CPR and mental health first aid certification managementDocumented by vendor

    The emergency management module page describes managing fire and first aid wardens from nomination through training to retirement, and tracking first aid, CPR and mental health first aid certifications with expiry management. How reminders are triggered, and any treatment log or first aid kit register, are not described on the page.

    First aid, CPR and mental health, checked 1 October 2026
    Psychosocial hazard management moduleDocumented by vendor

    The psychosocial module page describes psychosocial risk assessments with heatmaps and matrices, anonymous hazard reporting, trauma-informed root cause analysis, dashboards with sentiment views, linked training and ISO 45003 alignment wording. Return-to-work handling, wellbeing check-in formats and detailed confidentiality controls beyond anonymity are not described on that page.

    Psychosocial hazard management module, checked 1 October 2026

    HSI Donesafe pricing

    Subscription, contact vendor

    Pricing is customized using the total number of workers, selected application modules and support services. No numeric rate, currency or billing interval is publicly specified on the reviewed pricing page. Request a quote defining contractors and occasional contributors, implementation, configuration changes, integration access and ongoing support. The pricing page refers to 50+ modules while the modular platform page says 60+, so the two pages disagree on the module count; ask Donesafe which modules your proposal covers.

    Pricing sources checked : Selected sources checked; no starting price recorded. Official pricing page accessed.

    Which product scope should the quote cover?

    Configurable EHSQ forms, workflows and connected application modules.

    Ask the vendor to identify the product, region, modules, billing unit, contract term and included services in writing.

    Offline app and automatic sync documented; limits need demo

    Donesafe documents an offline application for forms, checklists, audits, hazards and incidents, with automatic synchronization after reconnection. Test the target device and workflow rather than assuming the browser experience has identical offline behavior.

    What we could not verify

    2 depend on scope · 3 notes
    • Depends on plan or configuration: Modular deployment; System integration.
    • The pricing page says the vendor can help set up a sandbox of the customer's environment as part of a guided evaluation; its scope, duration and any charge are not stated.
    • Worker count, chosen modules and support services are disclosed as pricing inputs; numeric rates and a self-service free trial were not verified.
    • This research did not verify attachment limits, concurrent edit handling or disconnected access to every configured module.

    Demo script

    Demo exercise: offline hazard to action

    1. Load the intended form, disconnect the device and capture a test hazard with a photo.
    2. Restart the application, reconnect and inspect the uploaded record and evidence.
    3. Assign a corrective action and show what the reporter can see when it closes.

    Demo exercise: contractor onboarding

    1. Invite a test contractor to register and upload a qualification.
    2. Show the notification and access outcome for an expired qualification.
    3. Log a contractor hazard and verify visibility for the contractor and site manager.

    Demo exercise: quality nonconformance to verified CAPA

    1. Log a representative nonconformance against a named specification and attach supporting evidence.
    2. Complete the investigation and root-cause step, then assign corrective and preventive actions to separate owners.
    3. Reject weak closure evidence, verify the corrected response and export the approval and change history.

    Ask the vendor to show you

    1. How are contractors and occasional contributors counted in the worker-based quote?
    2. Which configured modules and fields are available in the offline application?
    3. Who maintains forms and automation after implementation, and what support is included?
    4. What happens when two users edit the same record before synchronization?

    Checks specific to this product

    Module and worker-count basis:
    Pricing is customised by number of workers, modules and support services. Request a quote that defines how contractors and occasional contributors are counted, and lists implementation, configuration changes and integration access separately.
    Incident stages and reviewer separation:
    The incident module describes triage, root-cause analysis, investigation review, corrective actions and actions review. Enter a test incident and demonstrate who can approve each stage, including rejection and reopening, and retain the stage log.
    Use demo checklist

    Questions the sources answer

    Does Donesafe work without internet access?

    The offline application supports forms and checklists, including safety capture, then syncs after reconnection. Confirm the selected modules, attachments and conflict handling with your actual devices.

    Can contractors report directly in Donesafe?

    Contractor Management describes self-registration and direct incident or hazard logging. That does not establish anonymous or account-free reporting. Ask to see the contractor's exact registration and access steps.

    Can a team introduce Donesafe gradually?

    The modular platform allows a selected set of connected applications. Start by testing one complete operational workflow and its owner responsibilities. Add modules after agreeing configuration governance and the commercial effect.

    Sources and change log

    15 sources, checked

    Compare with

    Drawn from the profiles behind the Alternatives list above: most category tags shared with HSI Donesafe first, then the closest overlap in documented capability names, then A to Z. Ratings, search demand and sponsorship are not used; rows are shown A to Z.

    • IsoMetrix

      Shared category tags: 1 (Quality Management).

      Same: scope, offline, price and trial.

    • ITRAK 365

      Shared category tags: 1 (Incident Management).

      Same: scope, offline, price and trial.

    • Origami Risk

      Shared category tags: 1 (Incident Management).

      Same: scope, offline, price and trial.

    All HSI Donesafe alternatives

    Reviews

    This site does not currently collect reader reviews. Star ratings and review counts from the old catalog are not shown: no source for them was recorded.

    Reviews elsewhere may be filed under other names

    Also recorded as Donesafe. Older entries under a previous name may describe a different release or owner.