Asset Integrity and Maintenance Software: Compare Documented Scope
Asset integrity, inspection data management, maintenance execution and condition monitoring are related purchasing needs with different requirements. Compare the listed products against the actual work you need to perform. The list applies one published rule to every product and uses vendor documentation, not hands-on testing.
Jump to the 8 productsEditorial responsibility: Dimitris Mitsios (Founder of The QHSE Standard; product marketing at Tekmon) · Tekmon pays for sponsored placements on this site (disclosure) · How pages are made · LinkedIn
On this page (11 sections)
Asset integrity and maintenance products that meet the rule
Each card shows the capability in the product's record that admitted it, with its source. A maintenance work-order capability and an integrity or inspection-data capability are different purchases; the table under the cards keeps offline scope and pricing conditions per product.
Tekmon pays for a sponsored placement (above); its place in this list follows the same rule as every entry. How lists are ordered
Same rule for every product: tagged “Asset Integrity”, “Asset Management” or “Equipment Maintenance”, with a sourced asset integrity, inspection data or maintenance capability in its record, or one the vendor stated to us, labelled as vendor-stated. 8 qualify.
MaintainX
Documented: Work orders and procedures. Source: getmaintainx.com
UpKeep
Documented: Maintenance orders and assets. Source: upkeep.com
Fiix
Documented: Connected maintenance records. Source: fiixsoftware.com
Cenosco IMS
Documented: Maintenance strategy. Source: cenosco.com
Metegrity Visions Enterprise
Documented: Equipment and inspection history. Source: metegrity.com
Tractian
Documented: Work-order context. Source: tractian.com
Tekmon
Documented: Maintenance and asset workflows. Source: tekmon.com
Prometheus Group
Documented: Maintenance planning and scheduling (conditional). Source: prometheusgroup.com
| Product | Published price | Free trial | Offline workflow |
|---|---|---|---|
| MaintainX | Yes | Free trial documented | Documented |
| UpKeep | Yes | Free trial documented | Documented |
| Fiix | Yes | Not established | Documented |
| Cenosco IMS | No | Not established | Partial |
| Metegrity Visions Enterprise | No | Not established | Not classified |
Status labels from each profile's sourced record; open the profile for the evidence and dates.
The table shows the first 5 products of the list, in the same order; every profile carries the same fields.
Define the engineering task before comparing products
Separate inspection records, risk-based inspection methods, engineering calculations, maintenance work orders and sensor monitoring. A product with one of these capabilities does not automatically provide the others.
For each required method, ask for the exact application, supported edition, inputs, assumptions, calculation output and review process. A vendor reference to an industry standard is not a certification of your implementation.
Which need are you buying for?
| Need | Record it produces | What to ask first |
|---|---|---|
| Inspection data management | Inspection points, readings over time, findings and the date of the next inspection | Can readings be compared across inspections of the same location, and who approves a changed interval? |
| Risk-based inspection | A documented likelihood and consequence assessment that drives inspection planning | Which method and edition are implemented, what are the inputs, and who signs the result? |
| Maintenance execution | Work orders, preventive schedules, labour, parts and asset history | Can an inspection finding create a work order and carry its reference through to completion? |
| Reliability analysis | Failure modes, maintenance strategy and criticality rankings | Is the analysis performed in the product or imported from another tool, and are versions kept? |
| Condition monitoring | Sensor readings, alerts and fault context | Which hardware is required, what happens when connectivity drops, and what is priced separately? |
Use the same asset in every demonstration
A worked example: what the software calculates and what it assumes
The figures here are hypothetical and show the arithmetic only. Suppose a pipe wall measured 12.0 mm at one inspection and 11.6 mm two years later at the same location. The simplest reading is a loss of 0.2 mm a year. If the minimum thickness required for the service is 10.0 mm, the remaining margin is 1.6 mm, which at that rate lasts about eight years.
A product can produce that number in seconds, which is why the demonstration should ask about the assumptions behind it. Was the later reading taken at the same point with the same method and instrument? Is the rate linear, or does the product allow a short-term and long-term rate? Where does the minimum thickness come from, and who changed it last? An inspection interval is then a decision by a qualified engineer using the output, not an output of the software.
How implementations commonly go wrong
Questions for vendors, and how to read the answers
| Question | A good answer shows | A thin answer looks like |
|---|---|---|
| Which calculation or inspection method is implemented? | The method, edition, input fields, output and the review step, shown on an asset of yours. | A reference to an industry standard with no description of what the product does with it. |
| Which module holds this function? | A named application and edition, with the licence line it appears under in the proposal. | A statement that the platform covers it, without a module name. |
| What happens to a record captured offline? | A demonstration of capture, edit and synchronisation after a forced disconnect, including a conflict. | A statement that the mobile app works offline, or a PDF export described as offline capability. |
| How does an approved action reach maintenance? | A tested exchange with your system, including a rejected or duplicated transfer and who is notified. | A list of supported formats with no failure handling. |
| What does the full record contain on export? | Assumptions, versions, approvals, attachments and history in a readable format. | Readings and statuses only. |
Compare complete costs
Request software modules, assets, sites, users, storage, implementation, data migration and interfaces as separate proposal items. Where monitoring hardware is involved, include sensors, gateways, connectivity, installation and replacement terms.
Do not turn a package, asset-based or hardware subscription into an assumed per-user price. The linked profiles preserve published conditions and mark unverified commercial terms.
What the admitting capabilities actually describe
Under the rule that builds the list above, 8 products currently qualify: 7 through a documented capability and 1 through a conditional one. Counting by the wording of each admitting capability: maintenance, work-order or preventive-schedule wording appears in 7; inspection, integrity or condition-data wording appears in 1; wording from both groups appears in 0. The groups are assigned by keyword on the capability name and quoted scope, so treat them as a reading aid, not a classification the vendors made.
The practical point is that the rule is deliberately broad, and the admitting capability is often a maintenance one. If your requirement is inspection data, thickness history or risk-based inspection, open each card and check which capability admitted the product before shortlisting it, then ask for the inspection function by name in the demonstration. A product admitted for work orders has not been shown to hold inspection findings, and the reverse also applies.
Sources and evaluation method
122 sources, checked 28 Sep 2026
MaintainX
Sources checked: 14 October 2026.
- Work-order and technician workflow
- Pricing and plan entitlements
- Offline mode, roles and cache preparation
- MaintainX company identity
- MaintainX REST API setup and organization-scoped keys
- MaintainX SAML SSO scope and Enterprise requirement
- MaintainX security and assurance overview
- Maintenance reporting, dashboards, audit trails and scheduled exports — checked 28 September 2026
- Procedure templates and attached work instructions
- Inspection fields, evidence, signatures and conditional logic
- Corrective work-order triggers
- Work-order settings
- Work-request portals, approvals and routing
- Work-request approval and rejection
- Purchase-order scope
- Purchase-order approval and fulfillment workflow
- Condition-based maintenance automations
- Meter scope and readings
- Permit-to-work approval process
- Permit to Work documented as Beta in August 2026
- Work-order completion scope
UpKeep
Sources checked: 14 October 2026.
- UpKeep CMMS scope
- Pricing and trial entry point
- Offline plans, preparation and limits
- Technical and connectivity requirements
- UpKeep integrations, REST API and webhook scope
- UpKeep Trust Center, data region and assurance documents
- Maintenance analytics, audit trails and scheduled reporting : checked 28 September 2026
- Preventive maintenance triggers, checklists and parts planning : checked 28 September 2026
- Asset registry, hierarchy, lifecycle records and QR lookup
- Multi-storeroom parts inventory, scanning and reorder controls
- Maintenance procurement, approvals, receiving and three-way match
- Maintenance request portal product scope
- Request Portal plan availability, QR access and configuration
- Work order detail sections and status menu
Fiix
Sources checked: 14 October 2026.
- Fiix CMMS product scope
- Pricing, free plan and paid entitlements
- Offline mode and local-data limitations
- Mobile synchronization behavior
- Mobile application scope
- Enterprise API entitlement, limits and support boundary
- Enterprise SSO protocols, MFA boundary and fees
- Fiix security and vendor SOC 2 statements
- Maintenance analytics, reporting and audit-history scope : checked 28 September 2026
- Professional and Enterprise analytics entitlement and sharing options : checked 28 September 2026
- Meter-reading scheduled-maintenance triggers and v6 Equipment limitation : checked 28 September 2026
- Meter-reading capture methods and import-trigger limitation : checked 28 September 2026
- Fiix mobile CMMS app overview
Cenosco IMS
Sources checked: 14 October 2026.
- IMS suite and equipment scope
- Pressure equipment integrity
- Reliability-centered maintenance
- Safety instrumented systems
- IMS4Field mobile add-on
- Retired IMS Offline application
- Integration services
- Implementation and migration
- Roles and approval controls
- PEI inspection schedule lifecycle
- Inspector workload and approval dashboard
- Standard and custom reporting
- PEI risk-based inspection methods
Metegrity Visions Enterprise
Sources checked: 14 October 2026.
- Visions Enterprise core, modular design and mechanical-integrity features
- VISIONSGO field workflow and controlled contractor exchange
- RBI Bundle dependency, current bundle and roadmap boundary
- Fugitive Emissions LDAR, repair and reporting scope
- Demo and commercial contact route
- VISIONSGO account, location, media, retention and data-handling policy
- Visions Enterprise module catalogue and dependencies
- Implementation, configuration, integration, migration, training and support services
- Implementation, data migration, proof-of-concept and named EAM/CMMS interfaces
- Audit trails, RBI, inspection planning and corrosion-trending workflow claims
- Integrity Manuals and IOW engineering context
- First-party Methanex implementation and migration case study
Tractian
Sources checked: 14 October 2026.
- Sensor commercial scope
- System integration catalog
- Mobile CMMS enrichment
- Sensor-to-work-order workflow
- Fleet CMMS page: work orders with parts, mileage or hours scheduling, KPIs, offline mobile app
- CMMS video documentation including TracOS offline
- Condition monitoring, multimodal sensing and failure lifecycle
- Vibration-analysis workspace and sampling modes
- Parts inventory, reservations and purchasing workflow
- Condition-monitoring technical FAQ and analyst boundary
- Tractian trust center
Tekmon
Sources checked: 28 September 2026.
- Platform overview and product positioning — checked 28 September 2026
- AI-assisted workflow, inspection-photo and reporting demonstrations — checked 28 September 2026
- Official Tekmon customer video: London Underground
- Enterprise pricing model and product positioning
- Audit templates, findings and mobile capture
- Quality workflows and document records
- Work instructions and offline access
- Maintenance scope and API references
- Free trial conditions
- Enterprise Pilot Program
- Safety application scope
- Permit requests, routing and supporting evidence
- Vendor CAPA workflow overview
- Supplier-quality audits, CAPA and offline evidence — checked 28 September 2026
- Vendor case study: connected QHSE and ESG deployment — checked 28 September 2026
- Incident capture, routing and follow-up (vendor product page)
- GHG emissions calculation (vendor product page)
- Waste data capture and reporting (vendor product page)
- Training records and certification tracking (vendor product page)
- Configurable risk assessments and matrices (vendor product page)
- Supplier audits and self-assessments (vendor product page)
- Complaint intake, routing and linked actions (vendor product page)
- Multi-framework ESG disclosure reporting (vendor product page)
- Contractor prequalification, inductions and site passes (unlinked vendor page, not in site navigation)
- Equipment certification register and QR status checks (vendor product page)
Prometheus Group
Sources checked: 11 October 2026.
- Tailored pricing and packaging
- Electronic permitting and safety
- RiskPoynt process safety
- SAP Mobile EAM
- Mechanical integrity
- EHS portfolio and integration scope
- Planning and Scheduling solution
- Shutdown, Turnaround and Outage Manager
- Reporting and Analytics solution
- SAP, Oracle and IBM Maximo integration scope
- Prometheus portfolio overview
- Oracle Mobile EAM connectivity boundary
- Prometheus Group trust center
No numeric score is assigned from documentation alone (methodology), and the proposed demos were not performed by QHSEtech. Integrity decisions such as inspection intervals and fitness for service remain with qualified engineering review.
Software categories to explore
Use this Process to define the work, then explore these software types. Confirm the exact workflow and module with each vendor.
See all software categoriesContinue your evaluation
More related guides
- UK COMAH 2026: What Operators Should Build, Not Just Record
Article on UK COMAH compliance for operators.
- ATEX — definition, software & FAQs
Definition of ATEX.
- FMEA (Failure Mode and Effects Analysis) — definition, software & FAQs
Definition of failure mode and effects analysis.
- ALARP (As Low As Reasonably Practicable) — definition, software & FAQs
Definition of as low as reasonably practicable.
- Fault Tree Analysis (FTA) — definition, software & FAQs
Definition of fault tree analysis.






