Process Safety Software: PHA, MOC, Barriers and Permits
Process safety software can organize hazard studies, change reviews, barriers and work authorization. Compare the specific applications required for your process, because a broad EHS suite or permit form does not establish specialist engineering calculations. This guide uses vendor documentation, not hands-on testing.
Editorial responsibility: Dimitris Mitsios (Founder of The QHSE Standard; product marketing at Tekmon) · Tekmon pays for sponsored placements on this site (disclosure) · How pages are made · LinkedIn · Content date: 2026-09-25
On this page (5 sections)
Software categories to explore
Use this Process to define the work, then explore these software types. Confirm the exact workflow and module with each vendor.
See all software categoriesTekmonAd
Explore its published safety, quality and maintenance workflows. Confirm modules and pricing in a scoped proposal.
What Is Process Safety Management?
Process safety management addresses major hazards associated with industrial processes, including loss of containment. Software supports the people, procedures and engineering decisions needed to manage those hazards. It cannot substitute for those controls.
OSHA's process safety standard sets requirements for covered processes. Check applicability and exceptions for your facility using the official standard. Map required evidence to change management, incident investigation, maintenance and training workflows before comparing products.
Specialist Capabilities to Demonstrate
Process Hazard Analysis
HAZOP, What-If, FMEA, and Fault Tree Analysis studies with automated action tracking, revalidation scheduling, and scenario documentation.
Bow-Tie & Barriers
Visual bow-tie models linking threats, barriers, and consequences. Barrier health monitoring, degradation tracking, and critical control verification.
SIS/SIL Requirements
Distinguish target determination, quantitative verification and lifecycle records. Require evidence for the exact methods and calculation tools in the proposed application.
The 14 Elements of OSHA PSM
Use these program areas as a requirements checklist for covered processes. They are not a statement that every product below includes all of them, and software does not discharge the employer's responsibilities:
Dates and Records OSHA 1910.119 Fixes
Some PSM obligations run on fixed cycles, which makes them good demo tests: ask the vendor to show how each one is scheduled, who is reminded, and what evidence closes it. Paragraph references are to the current eCFR text of 29 CFR 1910.119.
| Element | What the standard sets | Ask the vendor to show |
|---|---|---|
| Process hazard analysis, (e)(6) | Updated and revalidated at least every five years after the initial PHA, by a qualified team | Revalidation due dates per process, and recommendations tracked to resolution |
| Training, (g)(2) | Refresher training at least every three years, and more often if necessary | Per-employee refresher dates linked to the current operating procedures |
| Pre-startup safety review, (i) | For new facilities, and for modified facilities when the change requires a change in process safety information, before highly hazardous chemicals are introduced | A PSSR checklist that references the change, procedures and resolved PHA recommendations |
| Incident investigation, (m)(2) and (m)(7) | Initiated as promptly as possible, but not later than 48 hours after the incident; reports retained for five years | The investigation start time, findings, resolution and retention settings |
| Compliance audits, (o)(1) and (o)(5) | The employer certifies an evaluation of compliance at least every three years; the two most recent audit reports are retained | Audit scheduling, findings tracked to closure and report retention |
Pre-Startup Safety Review: the Four Confirmations
A pre-startup safety review is required for new facilities, and for modified facilities when the modification is significant enough to require a change in the process safety information (1910.119(i)(1)). Under 29 CFR 1910.119(i)(2), it confirms, before highly hazardous chemicals are introduced to the process, that:
- Construction and equipment are in accordance with design specifications.
- Safety, operating, maintenance and emergency procedures are in place and are adequate.
- For new facilities, a process hazard analysis has been performed and its recommendations resolved or implemented before startup; for modified facilities, the management-of-change requirements of paragraph (l) are met.
- Training of each employee involved in operating the process has been completed.
The PHA and management-of-change conditions are one confirmation, not two. In the demo, ask the vendor to show a PSSR sign-off being blocked while a linked MOC action or PHA recommendation is still open, and to show which of the four confirmations each piece of evidence closes. None of the profiles below establishes a PSSR workflow on its own.
Editorial field-walkdown checks that sit under the first confirmation (not text from the standard): every line, valve, instrument and relief device on the as-built P&ID exists in the field with matching tag numbers; bypasses, blinds and temporary connections are documented or removed; vents and drains discharge to safe locations; and calibration of safety-critical instruments is current. A structured PSSR checklist template with 1910.119(i) cross-references is available free; it has not been reviewed by OSHA.
Seveso III Establishments in the EU
Directive 2012/18/EU (Seveso III) is a separate regime from OSHA PSM, with lower-tier and upper-tier duties set by the dangerous substances present. Every establishment needs a written major-accident prevention policy, reviewed at least every five years (Article 8). Upper-tier establishments also prepare a safety report, reviewed at least every five years (Article 10). Before a modification that could have significant consequences for major-accident hazards, the operator reviews and where necessary updates the notification, policy, safety management system and safety report (Article 11).
Competent authorities inspect on a plan; the interval between site visits must not exceed one year for upper-tier and three years for lower-tier establishments, unless the inspection programme is based on a systematic appraisal of major-accident hazards (Article 20). If you operate both US covered processes and EU Seveso establishments, build a requirements matrix per regime and ask each vendor to demonstrate both sets of records rather than assuming one configuration serves both. Our Seveso III compliance guide maps each duty in more detail.
Test the Handoffs Between Processes
Use one representative change or hazardous task in the demo. Follow its assessment, authorization, operational handover and closure, including an incomplete submission or changed condition. Check who can approve each step and which records remain available for review.
Include any required permit workflow, risk assessment and change review. Ask whether the handoff is native, configured or implemented through another system, and price that work explicitly.
For a management-of-change test, check whether an approved change prompts the PHA review for the affected process, the procedure and training updates and the pre-startup safety review, or whether that coordination still happens by email. Do the same for a mechanical-integrity deficiency: follow it from inspection finding to completed repair.
Requirements Checklist, Confirm Each Item Separately
Process safety products and what each record documents
Each entry states what its researched record documents and what it does not; this is not a ranking. A broad EHS suite or permit form does not establish specialist engineering calculations, so request a quote and a workflow demonstration of the named application before judging value.
Tekmon pays for a sponsored placement (above); its place in this list follows the same rule as every entry. How lists are ordered
Same rule for every product: tagged “Process Safety”, “Barrier Management”, “Risk Management”, “Risk Assessment”, “Control of Work”, “Permit to Work” or “Asset Integrity”, with a sourced process safety (PHA, barrier or management-of-change) capability in its record, or one the vendor stated to us, labelled as vendor-stated. 23 qualify; the first 8 are shown, then the other 15.
Haz360
Documented: PHA study templates. Source: haz360.com
BowTieXP
Documented: Bowtie scenario authoring and visualization. Source: wolterskluwer.com
Onspring
Documented: Risk register and mitigation management. Source: onspring.com
Prometheus Group
Documented: Mechanical-integrity inspection records. Source: prometheusgroup.com
Sphera Control of Work
Documented: Barrier and deviation visibility. Source: sphera.com
VisiumKMS
Documented: Management of change with pre-startup safety review. Source: visiumkms.com
Intelex
Documents incident and action workflows, a Permit to Work application and document control with revision history. A PSM module set was not established; ask which applications cover PHA, MOC and PSSR. Source: intelex.com
Synergi Life (DNV)
Documented barrier, incident and permit modules. Evaluate it for linked operational governance; SIL verification is not established by these sources. Source: dnv.com
Also meet the rule, in the same order (15)
Find the Right PSM Software
Compare process safety platforms side-by-side. Filter by industry, regulatory framework, and company size.
Browse All SoftwareRelated Guides
Sources and Evaluation Scope
Vendor research checked 19-20 September 2026; the OSHA 1910.119 cycle table, the pre-startup safety review section and the Seveso III section were added on 24 September 2026 from the linked legal texts. This is a documentation-based shortlist, not hands-on testing or a numerical ranking. Our framework considers functional depth (25%), usability and adoption (20%), implementation and TCO (15%), integrations and API (15%), security and trust (15%), and customer voice (10%). No verified customer-review sample is used here. AI-assisted explanations may be incomplete and do not replace primary documentation, a demo or competent engineering review. Featured partner introductions are separate from requirements-based selection.
- OSHA process safety overview
- 29 CFR 1910.119 (eCFR)
- Directive 2012/18/EU (Seveso III)
- Sphera PHA-Pro application
- Sphera PHA-Pro methods brochure
- DNV Synergi Life barriers
- DNV Synergi Life permits
- Enablon platform and PSM scope
- Intelex Permit to Work application
- Intelex document revisions and access controls
- Sphera Management of Change
- IsoMetrix risk scope
- Benchmark Gensuite control of work