Assignar vs HammerTech: Scope, limits and demo questions
Side-by-side comparison
| Attribute | Assignar | HammerTech |
|---|---|---|
No amount on record; request quote | ||
Construction Safety | EHS Management | |
Validate user roles, sites and scale against your proposed deployment. | ||
Confirm hosting, support languages and contractual coverage for your region. | ||
See the linked profile's capability evidence | ||
See the linked profile's unresolved questions | ||
Partial offline workflow | Documented offline workflow | |
Where the two scopes differ
These records share a customer, the construction contractor, and a concern with subcontractors, but they use the worker differently. Assignar's record places the worker inside operations: qualifications and documents with expiry alerts, skill and certification signals on a scheduler, supervisor site diaries, timesheet approval and export, and custom forms for equipment checks and incident reports. HammerTech places the worker at the gate and at the permit: orientation content with quizzes, a reviewer who approves or rejects the submitted record, permits, pre-task plans and inspections. Assignar's question is who can be scheduled to this job and what the day produced. HammerTech's is who has been oriented and approved to start, and under which permit.
The most important gap is what happens when a credential is missing. Assignar's scheduler surfaces double-booking, missing certification and role mismatches before and after allocation, and its record presents them as aids to a human decision while noting that no hard stop on dispatch is documented. HammerTech's record describes expiry alerts on worker credentials and a reviewer decision on orientation, but it does not establish that a missing item stops a worker entering a site; the vendor's access-control page does describe Irongate hardware that blocks workers with lapsed credentials, which is a separate hardware route to demonstrate. The record also asks the buyer to keep completion, credential review and authorisation for the task apart. A requirement written as must be blocked therefore needs a demonstration in both products, run on the buyer's own configuration.
Commercial and technical terms are alike in being unpublished, and different in what they leave open. Both are quote-only. Assignar's record asks for Operations features, dashboard and field users, onboarding, term and region as separate lines, treats Assignar Pay as a separate offering and describes the public API as an add-on; its evaluation route is a demo-led test drive. HammerTech's record says pricing is not per user and reflects construction volume, company size, active sites and support level, and lists named connections and an Open API whose ownership and entitlement remain to be confirmed, plus a hardware route through Irongate with its own contract questions. Offline is partial in both: Assignar documents automatic and manual offline modes and a short list of offline functions, but its record finds no full cache, attachment queue or conflict behaviour, while HammerTech documents Inspect only.
Assignar: status on record
- Trial: No free trial established.
- Offline: Partial offline workflow.
- Pricing: No amount on record; request quote.
- Profile record checked 14 October 2026.
HammerTech: status on record
- Trial: No free trial established.
- Offline: Documented offline workflow.
- Pricing: No amount on record; request quote.
- Profile record checked 14 October 2026.
When each is the safer first demo
Start with Assignar when
Assignar is the safer first demo when crews, equipment and recurring paperwork share one bottleneck. Schedule a compliant and a non-compliant candidate and see exactly what the signals do, then have a supervisor fill in a site diary covering crew time, a photo note, weather and a client signature. The record warns that dashboard edits can replace the supervisor signature and remove the client signature, so edit the diary from the dashboard and look at what the PDF and the timesheet export then show.
Start with HammerTech when
HammerTech is the safer first demo when readiness for hazardous work and closure by subcontractors come first. Follow a worker from orientation to a permit and a pre-task plan with its linked job hazard analysis and crew sign-offs, then an inspection issue assigned to a trade and closed through the subcontractor route. Ask which steps work offline: the record documents it for Inspect, and shows no offline matrix for permits, pre-task plans or orientation approval.
A two-week evaluation plan
Ask Assignar
- Itemise Operations features, dashboard and field users, onboarding, term, regional scope and any Pay offering on separate lines, with the public API add-on and its owner.
- Ask which forms, documents and assignments stay available offline beyond what the help article lists, and what the attachment queue and conflict behaviour are.
Ask HammerTech
- Ask for the quote assumptions in writing: annual construction volume, active sites, onboarding and support level, billing term and renewal treatment, plus named connectors, Open API entitlement and any hardware.
- Ask which projects and records the general contractor's access gives a subcontractor, and how worker evidence is retrieved after a subcontractor leaves and after the contract ends.
Week 1, the missing credential. Create test workers, one with every required credential and one with an expired item. In Assignar, try to schedule both and note whether the signal warns or blocks, then renew the credential and watch the notification. In HammerTech, submit an orientation with a deliberately missing item, have a reviewer reject and then approve it, and try to start a permit and pre-task plan. Use a restricted subcontractor account in each, since both records ask for subcontractor visibility to be tested. Neither record establishes a free trial, so ask for a vendor-led environment and agree test data and dates before starting.
Week 2, the paperwork that follows. In Assignar, complete a site diary as a supervisor, edit it from the dashboard and inspect what changed in the signature, the PDF and the approved timesheet export. In HammerTech, run an inspection with an issue assigned to a trade, capture it with the device offline, close it through the subcontractor route and compare the evidence trail. Finish by asking each vendor for a three-year cost with the interfaces you plan: a payroll file or connector for Assignar, and a named connection or the Open API for HammerTech.
Worked evaluation scenarios
These scenarios are hypothetical. They show how to turn the record facts into a demo test and what outcome would change a choice; they are not case studies or customer results.
Hypothetical: an operator whose ticket expires the day after allocation
A civil contractor's dispatcher allocates an excavator operator whose ticket expires tomorrow. The Assignar record says scheduler signals show missing certification and role mismatches before and after allocation as aids to a human decision, documents no hard stop on dispatch, and describes expiry alerts. The HammerTech record describes expiry alerts on worker credentials and a reviewer decision on orientation, and notes that the vendor's access-control page describes Irongate hardware refusing entry for lapsed credentials. Set up one operator with an expiring credential in each product and watch which alert fires, to whom, how early, and whether any step stops the allocation or the entry. If your rule is no ticket, no work, the answer you need is which component enforces it and whether it is in the quote.
Hypothetical: a pipeline crew that works offline for most of the day
A pipeline crew works without coverage for most of a shift and must complete forms, a timesheet and an inspection. The Assignar record documents automatic and manual offline modes, assignments about three days either side, timesheets, forms other than Collaborative Forms and dockets outside an assignment, from a minimum app version, but not attachment handling or conflict behaviour. The HammerTech record documents offline work for its Inspect app only, with no matrix for permits, pre-task plans or orientation approval. Check the app version, then take a device to a room with no signal, with exactly the forms and roles the crew would use, and finish the day's paperwork. If a step you rely on is outside the documented list, or two edits collide on return, write a fallback.
Hypothetical: a payroll or project system that must receive the data
A contractor wants approved timesheets or worker records to reach its payroll or project system without re-keying. The Assignar record describes timesheet approval and export, a distinction between partner-connected integrations and import or export, and a public API sold as an add-on. The HammerTech record lists named connections, with Procore, Autodesk and CMiC among them, and an Open API, and says a partner listing does not show a deployed interface. Ask each vendor to name the exact connector or file format for your system, who builds it, what it costs and whether it is in the quote. Then send one test record through and correct it afterwards. The decisive result is a missing or unpriced route, since a feature page naming your system is not a working interface.
What the records do not establish
Assignar
- A public subscription amount, an unrestricted free trial, or the price of the API add-on.
- A hard block on dispatching a worker whose credential is missing.
- A full offline record cache, the attachment queue or conflict behaviour.
- Investigation or permit-to-work depth from a configured form.
HammerTech
- A subscription amount, term or renewal formula, or any automatic true-up to construction volume.
- Offline permit, pre-task-plan or orientation approval.
- That a listed connection or the Open API is deployed for your systems.
- Outcome evidence: dashboards and trends are not proof of fewer incidents.
Neither product
- That a completed form, diary or orientation shows competence or authorisation for a task.
- Implementation time, total cost or customer satisfaction.
- Any hands-on result: both records are reviews of vendor documentation.
Written from the profile records and the decision guide above, not from a hands-on test. Where a record is silent, the page says so instead of filling the gap.
Evaluate Assignar
- Identify the exact product, application and licence.
- Review the profile's demonstration questions.
- Run the same task and record unresolved questions.
Evaluate HammerTech
- Identify the exact product, application and licence.
- Review the profile's demonstration questions.
- Run the same task and record unresolved questions.
Assignar vs HammerTech | FAQ
Which product is cheaper?
How should I compare offline capability?
How should I decide between these products?
Vendor sources and next steps
Assignar17 sources, profile checked 14 October 2026
- Pricing and evaluation route
- Construction field forms
- Form configuration and access
- Help article: working offline in the mobile app (automatic and manual offline modes)
- Workforce compliance records
- Integration routes and API add-on
- Recent product updates — checked 28 September 2026
- Mobile supervisor scheduling — checked 28 September 2026
- Crew scheduling product scope — checked 28 September 2026
- Allocations and competency visibility — checked 28 September 2026
- Scheduling conflict and compliance signals — checked 29 September 2026
- Role-based compliance and scheduling — checked 29 September 2026
- Supervisor Site Diary workflow — checked 29 September 2026
- Web timesheet review and approval — checked 29 September 2026
- Asset document expiry alerts — checked 29 September 2026
- Dashboard Site Diary review and signature behavior — checked 29 September 2026
- Assignar trust centre
HammerTech14 sources, profile checked 14 October 2026
- Pricing and contractor access
- Inspect mobile boundaries
- Orientation and worker records
- Orientation review and approval
- Permits
- Pre-task plans
- Reporting and Insights
- Irongate access-control scope
- Integrations
- Construction platform
- Demo request
- Safety inspection workflows and reporting views — checked 28 September 2026
- Fall protection section in high-risk inspection, checked 1 October 2026
- Fall protection section in high-risk inspection (2), checked 1 October 2026