Proposed demo: facility risk study to occupied building result
- Set up a sample facility with leak frequencies, weather and population data.
- Run the study and review individual risk contours, the FN curve and risk ranking points.
- Add an occupied building and show the explosion outputs, noting which need an add-on.
- Change one mitigation measure and compare the risk results before and after.
- Export contours as a shapefile and open them in a GIS.


