Skip to main content
    QHSEtech
    Updated 21 September 2026
    Software buying guide

    Lockout/Tagout Software: Revisions and Approval Records

    Lockout/tagout software can organize equipment-specific procedures, linked isolation records and the history of reviews and authorizations. Start by identifying which of those records your team needs to control. A searchable procedure, a recorded approval and the physical condition of equipment are distinct things; buying software does not establish that work is safe to begin. This guide compares documented product scope and provides a fictional record-review exercise for a vendor demo.

    Jump to the 18 products

    Editorial responsibility: Dimitris Mitsios (Founder of The QHSE Standard; product marketing at Tekmon) · Tekmon pays for sponsored placements on this site (disclosure) · How pages are made · LinkedIn

    Official sources checked 21 September 2026. Product documentation and editorial demo questions; no hands-on product test or site-specific energy-control procedure.

    TekmonAd

    Explore its published safety, quality and maintenance workflows. Confirm modules and pricing in a scoped proposal.

    Choose the LOTO software scope you need to demonstrate

    Record scopeBuying questionEvidence to request
    Procedure libraryHow is an equipment reference connected to a reviewed, effective procedure revision?Version identity, owner, review decision, effective status and treatment of older copies.
    Isolation and work recordsHow are individual records associated with equipment, people and the relevant work pack?Persistent references, relationship history and visible incomplete or conflicting information.
    Authorization and handoverWho can record, review or approve each state change in the configured workflow?Role scope, attributable decisions, timestamps and a documented handover record.
    Programme reviewHow can reviewers find missing evidence, changes and unresolved findings?Review assignments, retained source files, follow-up status and a reproducible export.

    Documented product scopes to investigate

    These are different purchasing scopes, not evidence that the applications provide identical controls. The linked profiles retain their own evidence dates and commercial scope; their pricing or mobile fields do not establish an equivalent LOTO package. Ask for the exact applications, product version and configuration in each proposal.

    Ordered by how closely our sources document this process, not by quality. Sponsored placements are labelled. How lists are ordered

    Same rule for every product: tagged “Permit to Work”, “Permits to Work (PTW)”, “Control of Work”, “Industrial Safety”, “Safety Management” or “EHS Management”, with a sourced lockout/tagout or isolation capability in its record, or one the vendor stated to us, labelled as vendor-stated. 18 qualify; the first 8 are shown, then the other 10.

    Demo case: a procedure revision and an incomplete review pack

    Use an isolated vendor demonstration environment with fictional equipment ASSET-L17. PROC-L17 revision 3 is the previously approved document in the example, and draft work pack PACK-L17 revision 1 references it. The demonstration contains administrative record labels only, with no energy sources, isolation actions or real equipment instructions.

    A document owner proposes revision 4 to correct an equipment-description field and replace attachment ATT-L17. Keep revision 3 and its approval history intact. Show revision 4 as a draft with its author and change reason; identify PACK-L17 as potentially affected instead of silently replacing its referenced document. The responsible reviewer decides the impact under the organization's configured rules.

    The reviewer expects supporting file EVID-L17, but the file is unavailable. Record the gap and its owner. A checked form field, missing attachment or newly uploaded file must not be presented as completed review in this exercise. Preserve what was requested and what remains unresolved.

    Use a second test account whose approval role does not cover this fictional site. Ask the supplier to demonstrate that this account cannot approve the changed pack under the agreed role rules, while preserving whatever reading or drafting rights were intentionally assigned. Inspect the recorded decision and account identity; do not test a live work authorization.

    When the owner supplies EVID-L17, retain its source version and record the reviewer assessment separately from the upload. Prepare PACK-L17 revision 2 for review, with the proposed PROC-L17 revision 4 reference and the disposition of the earlier gap. The endpoint is a reviewable demonstration record, not an instruction to approve the procedure, remove controls or release equipment. Keep the original pack reproducible.

    Keep document, evidence and authorization histories distinct

    Fictional recordChange introducedWhat the buyer should be able to inspect
    ASSET-L17 / PROC-L17Previously approved revision 3 → proposed revision 4Stable equipment identity, changed description, attachment version, author, reason and separate draft/review states.
    PACK-L17 revision 1The linked procedure has a proposed correctionOriginal revision 3 reference and approval history remain reproducible; potential impact is visible.
    EVID-L17Expected supporting file unavailable → later suppliedMissing status, owner, source file and version, followed by an explicit reviewer assessment.
    Reviewer test accountsOne account lacks approval authority for the example siteConfigured role scope, attempted decision and correct treatment of permitted reading or drafting.
    PACK-L17 revision 2New review pack references proposed procedure revision 4Changes, evidence disposition and review status remain distinct from any operational authorization.

    Verify the product version and each offline action

    The iPermit2.0 landing page distinguishes cached reading and queued notes or photos from actions requiring connectivity, including permit approval and isolation sign-off. Its 2026 brochure, page 9, uses broader wording about creating, reviewing and updating permits and isolations offline. Treat this difference as unresolved scope to clarify for the proposed version.

    Ask every supplier to show the last synchronization time, the document revision visible on a disconnected device and what happens when another user changes the source record. Identify actions that are unavailable, queued or subject to renewed review. A mobile screen or downloaded PDF does not establish current authorization or completed synchronization.

    Record the exact version, offline action matrix and reconciliation result in the proposal. For the wider test sequence, use the offline software comparison and digital permit-to-work guide.

    Keep programme requirements and software evidence separate

    For relevant US workplaces, OSHA 29 CFR 1910.147 defines its scope and exclusions and addresses procedures, training and periodic inspections. It is not a universal rule for every industry or jurisdiction, and this guide does not determine applicability. Have the responsible specialist identify the requirements and review basis for your operation.

    Translate those requirements into records and permissions the vendor must demonstrate. Keep training evidence, an assigned software role, a review decision and actual equipment status distinct. A QR code, digital signature, green dashboard or completed checklist does not by itself prove effective hazardous-energy control.

    Use the management-of-change guide to evaluate how a reviewed change is connected to affected documents and tasks. Ask which links are configured, which are manual and who resolves failed updates.

    The stages of an isolation sequence

    The figure names the stages that most lockout and tagout procedures cover, so you can see which record a tool should hold at each one.

    Isolation sequenceNine stages across two roles from preparation to restart notice, with a return path when energy is still found at the verification stage.Authorized employeeAffected employeesEnergy found: isolate againStep 1PrepareProcedure revision,equipment and energysources identified.Step 2Notify affectedemployeesWho was told, andwhen.Step 3Shut downTime of the normalstop and who carriedit out.Step 4IsolateEach energy-isolatingdevice and its state.Step 5Lock and tagLock and tag identityfor each device, andits holder.Step 6Verify zero energyStored energy dealtwith; check method,person, time andresult.Step 7Do the workWho is covered bywhich lock, includingat shift change.Step 8Remove locks andtagsArea-clear check, whoremoved each lock andany exception.Step 9Tell affectedemployees andrestartNotice given beforeequipment isre-energized.
    Overview only. The site's written procedure sets the actual steps, and the software holds records rather than performing them. Role names follow common US usage.
    Text version of this diagram
    1. Step 1. Prepare. Owner: Authorized employee. Procedure revision, equipment and energy sources identified. Then step 2.
    2. Step 2. Notify affected employees. Owner: Affected employees. Who was told, and when. Then step 3.
    3. Step 3. Shut down. Owner: Authorized employee. Time of the normal stop and who carried it out. Then step 4.
    4. Step 4. Isolate. Owner: Authorized employee. Each energy-isolating device and its state. Then step 5.
    5. Step 5. Lock and tag. Owner: Authorized employee. Lock and tag identity for each device, and its holder. Then step 6.
    6. Step 6. Verify zero energy. Owner: Authorized employee. Stored energy dealt with; check method, person, time and result. Then step 7.
    7. Step 7. Do the work. Owner: Authorized employee. Who is covered by which lock, including at shift change. Then step 8.
    8. Step 8. Remove locks and tags. Owner: Authorized employee. Area-clear check, who removed each lock and any exception. Then step 9.
    9. Step 9. Tell affected employees and restart. Owner: Affected employees. Notice given before equipment is re-energized. End of the sequence.

    Feedback loops

    • From step 6 (Verify zero energy) back to step 4 (Isolate): Energy found: isolate again.

    Six demonstrations before choosing lockout/tagout software

    1

    Resolve the equipment and procedure reference

    Find fictional ASSET-L17 and PROC-L17 revision 3. Show document identity, effective status, owner and prior review. Open the same reference through the access method proposed for your users.

    2

    Propose a change without overwriting approval history

    Create draft revision 4 with the corrected description and replacement attachment. Show the author, reason, affected PACK-L17 reference and the configured impact-review process.

    3

    Keep missing evidence visible

    Mark EVID-L17 unavailable, assign its owner and inspect how that gap affects the agreed review workflow. Uploading the later file remains separate from reviewing and accepting its contents.

    4

    Test the agreed approval permissions

    In the demonstration environment, use the account without site approval authority. Confirm that its rights match the agreed role design and that approval decisions identify the responsible account and record revision.

    5

    Compare cached and current records

    Show last synchronization time and the procedure version on a disconnected device. Demonstrate the documented action limits and the treatment of a conflicting server update when connectivity returns.

    6

    Export a reviewable history

    Export both PACK-L17 revisions, their document references, missing-file history, source versions and reviewer decisions. Identify any unavailable export or configuration dependency; do not record an unperformed test as passed.

    Put the demonstrated record scope in the quote

    Name the LOTO or isolation application, product version, sites, equipment population and procedure migration scope.
    Specify role boundaries, approval configuration, contractors and any separate licensing for reviewers or field users.
    Document revision handling, effective dates, superseded copies, attachment history and change-impact ownership.
    Identify the exact permit, maintenance, document and training connections; include data mapping and failure handling.
    Attach an action-by-action mobile/offline scope with synchronization, stale-copy and conflicting-update demonstrations.
    Agree retention, export formats, access after contract end, configuration maintenance and the unresolved demo requirements.

    Build a shortlist around records you can explain

    Compare the listed profiles, then give each supplier the same fictional revision and review exercise. Record the named application, demonstrated behavior and remaining evidence gaps.

    Compare the first listed profiles

    Sources and limits of this guide

    6 sources

    Vendor documentation establishes published product scope, not a hands-on result, guaranteed safety outcome or entitlement in every package. The OSHA source supplies US programme context within its stated scope. All exercise records are fictional. This guide provides software evaluation questions; it does not prescribe isolation methods, physical verification steps, lock removal, equipment restoration or authorization to perform hazardous work.

    Software categories to explore

    Use this Process to define the work, then explore these software types. Confirm the exact workflow and module with each vendor.

    See all software categories

    Frequently Asked Questions

    What should lockout/tagout software manage?
    Start with the required record scope: reviewed procedures, equipment references, linked isolation or work records, authorization history and programme-review evidence. Products cover different parts of this workflow. Ask for the exact application and demonstrate it with a changed document and an incomplete review pack.
    Is LOTO software the same as permit-to-work software?
    The scopes can be connected, but a permit form does not establish a controlled procedure library or isolation dependency management. Conversely, a searchable procedure library does not prove a complete work-authorization workflow. Demonstrate the required references and decisions in the quoted applications.
    Does a digital approval prove equipment is safe?
    No. A software record can show a decision, its author and the evidence linked to it. It does not independently establish the physical condition of equipment or replace the organization's site-specific controls and competent decisions. The guide's fictional exercise ends with records ready for review.
    How should a revised procedure affect an existing work pack?
    Keep the original reference and review history, identify the proposed change and show the configured impact-review process. The responsible reviewer determines the affected records and required decisions under the organization's rules. Do not silently overwrite earlier evidence or treat a new upload as approval.
    Can LOTO approvals be completed offline?
    Confirm each action for the proposed version. IAMTech's landing page places approval and isolation sign-off among connected actions, while its 2026 brochure describes broader offline work. The guide flags that discrepancy. Cached reading, queued data and a completed authorization must remain distinguishable.
    Does purchasing software establish OSHA compliance?
    No. OSHA 1910.147 has a defined scope, exclusions and programme requirements; applicability must be assessed for the workplace and activity. Software may organize relevant records, but a vendor statement, report template or electronic signature does not establish compliance or approval of a particular deployment.