Skip to main content
    USA Regional Hub

    USA EHS & QHSE Software — OSHA, EPA, PSM & SEC Climate Rule

    Identify the federal, state and activity-specific records your US operations need before selecting software. OSHA recordkeeping, EPA reporting and covered PSM processes involve different requirements. Confirm applicability and current legal status with the responsible team, then test the exact outputs and approvals.

    Editorial responsibility: Dimitris Mitsios (Founder of The QHSE Standard; product marketing at Tekmon) · Tekmon pays for sponsored placements on this site (disclosure) · How pages are made · LinkedIn · Content date: 22 November 2026

    Key USA Regulations

    OSHA 29 CFR 1910 / 1926

    Federal General Industry and Construction standards. Covers HazCom, LOTO, Confined Space, Fall Protection, PPE, electrical safety and more — the foundation of any U.S. workplace safety programme.

    OSHA Recordkeeping (300/300A/301)

    Annual injury/illness logs (Form 300), summaries (300A), and incident reports (301). Required for most employers with >10 employees; electronic submission via ITA portal for many establishments.

    OSHA PSM (1910.119)

    Process Safety Management for highly hazardous chemicals. Mandates 14 elements including PHA, MOC, PSSR, mechanical integrity, and incident investigation. Critical for chemicals, refining and oil & gas.

    EPA RCRA, CAA, CWA, EPCRA

    Resource Conservation & Recovery Act (waste), Clean Air Act (Title V permits), Clean Water Act (NPDES, SPCC), and EPCRA Tier II / TRI reporting. Each generates structured data flows that EHS software should automate.

    SEC climate rules: stay and proposed rescission

    The SEC’s May 29, 2026 release says the March 2024 rules were stayed in April 2024, that it ended its defence in March 2025, and that it proposes rescinding them. A proposal is not final action; check the rulemaking file before treating these rules as an operative software requirement.

    State programmes (Cal/OSHA, MIOSHA, etc.)

    OSHA lists 29 State Plans: 22 cover private-sector and state or local government workers (21 states and Puerto Rico) and 7 cover public-sector workers only. They run their own standards, which must be at least as effective as federal OSHA's; Cal/OSHA's heat illness and IIPP rules are two examples. Multi-state operators need software that handles per-state rule variations.

    What to Look for in USA EHS Software

    OSHA 300/300A/301 automation

    The platform should generate OSHA-compliant logs and summaries from incident records automatically, support the ITA electronic submission CSV format, and flag recordable vs first-aid cases against current OSHA guidance.

    PSM module depth (if applicable)

    If you operate above PSM threshold quantities, ask each vendor to demonstrate the PHA, MOC and mechanical-integrity records a 1910.119 audit would examine, in the applications named in the quote. Our process safety management guide lists, by one published rule, the profiles whose records document PHA, barrier or management-of-change capability; none of them establishes a complete PSM programme.

    EPA reporting connectors

    Tier II, TRI Form R, GHGRP and NPDES DMR submissions are heavily structured. Ask each vendor to produce the specific submission output from sample data and to name who maintains it, rather than accepting a spreadsheet export as equivalent. The current GHGRP and TSCA PFAS reporting dates are in the dated EPA section below.

    Multi-state rule libraries

    Identify the applicable federal, state-plan and local requirements for each site. Ask who maintains the proposed rule library and demonstrate a changed requirement reaching the relevant workflow; an EHS label does not establish maintained local content.

    SEC and TCFD-aligned ESG

    Determine the reporting requirements that actually apply to the entity and financial year. Where GHG data is required, test boundaries, source records, factor versions, review and export without assuming the stayed SEC rules are operative.

    Workers' comp + OSHA integration

    Injury records may need to reach both a workers' compensation claims process and OSHA recordkeeping. Ask which claims systems a vendor connects to, and have it show the exchange from a sample case; an integration named on a vendor page is not proof it works for your carrier or administrator.

    SEC status source checked 27 September 2026 (State Plan counts checked against OSHA on 4 October 2026): SEC release, May 29, 2026. Check the rulemaking file for subsequent action; the cited release is a proposal, not a final rescission.

    What EPA changed in 2025 and 2026, and what is still proposed

    Read at epa.gov and in the Federal Register on 22 October 2026; the GHGRP part read again on 31 October 2026 and the TSCA part on 22 November 2026. Two EPA reporting programmes that environmental modules are often bought to feed have moved their dates, and neither change is finished. Whether either applies to a site is a legal question for the responsible team. Both dates are also rows of our compliance calendar for 2026 and 2027, and the PFAS glossary entry describes the substance class the second programme covers.

    Greenhouse Gas Reporting Program (40 CFR part 98)

    The programme covers certain industrial facilities, mostly those emitting at least 25,000 tonnes of CO2 equivalent a year, suppliers of fossil fuels and industrial gases, and CO2 injection sites; EPA puts the number of reporters at about 8,200. Reports for a calendar year are normally due by 31 March of the next. For reporting year 2025, EPA first moved that deadline to 30 October 2026 (final rule of 27 February 2026), then to 10 March 2027 by an interim final rule published and effective on 14 October 2026, 91 FR 65112, which changes nothing else in the rule. Comments on it are open until 30 November 2026. The rule provided for a virtual public hearing on 29 October 2026 if anyone asked for one by 19 October 2026, and the hearing went ahead: EPA’s rulemaking page, updated 28 October 2026, posted a registration list for it and a link to watch it live from 10am ET on 29 October, and the stream it links shows a 33-minute recording from that day. Federal Register, 14 October 2026; EPA GHGRP rulemaking notices (updated 28 October 2026)

    EPA says it needs the time to weigh the comments on its September 2025 reconsideration proposal, 90 FR 44591. That proposal would permanently remove reporting obligations for 46 source categories, suspend the remaining petroleum and natural gas segments of subpart W until 2034, and proposed that no annual reports be required for 2025. It drew more than 50,000 comments and was still a proposal on 31 October 2026: neither EPA’s pages nor the Federal Register showed a final rule. Until a final rule says otherwise, reporting-year 2025 reports remain due. EPA GHGRP page

    TSCA section 8(a)(7) PFAS reporting (40 CFR part 705)

    The 2023 rule requires anyone who manufactured or imported PFAS for a commercial purpose in any year since 1 January 2011, including PFAS in imported articles, to report uses, volumes, byproducts, exposure, disposal and existing hazard information through EPA’s Central Data Exchange. The submission window has moved several times. EPA’s final rule of 13 April 2026, 91 FR 18786, opens it 60 days after a forthcoming final rule on the substance of the reporting requirements takes effect, or on 31 January 2027, whichever comes first. It lasts six months, with six more for small manufacturers whose only duty comes from importing articles, and EPA says the forthcoming rule may change that length. Federal Register, 13 April 2026

    That substantive rule is still pending. EPA’s November 2025 proposal, 90 FR 50923, would exempt PFAS in mixtures or products at 0.1% or less, imported articles, certain byproducts, impurities, research and development chemicals and non-isolated intermediates. Comments closed on 29 December 2025. EPA’s page, last updated 16 April 2026, expects a final rule in 2026, and Federal Register searches on 22 October 2026 and again on 22 November 2026 found none, so the window opens on 31 January 2027 unless a final rule takes effect before 2 December 2026 (60 days earlier, our arithmetic). The one new document is a notice of 13 November 2026, 91 FR 73228, asking for the renewal of the rule’s paperwork approval, which changes no date. The same page still says under its May 2025 entry that submissions are due by 13 October 2026; the April 2026 rule replaced that date. EPA TSCA 8(a)(7) page

    Records to keep whichever way the rules land

    • GHGRP: the 2025 monitoring data and calculation inputs for each subpart, the emission factors and their versions, the report as submitted in e-GGRT, EPA’s verification messages and your replies, and who certified the report.
    • PFAS: for each year since 2011, the products and imports that contained PFAS, supplier declarations with the date each was requested and received, quantities, use categories, and the basis for any exemption you expect to rely on, kept until the final rule shows whether it applies.
    • For both: the rule citation behind each due date, so a moved deadline is changed deliberately and the old date stays in the history.

    Questions to put to a vendor

    • Which e-GGRT inputs can the tool produce from our data, in what format, and can you show one from sample data?
    • When EPA moves a deadline, can the due date be changed once, with the Federal Register citation stored and the earlier date kept?
    • Can supplier PFAS declarations be requested, stored and dated per part number and per year back to 2011?
    • Which list of TSCA PFAS does the tool match substances against, which version is loaded, and who updates it?
    • Can a product be marked as possibly exempt under a proposed rule without the tool treating the exemption as final?

    What we could not verify (22 and 31 October 2026)

    When the reconsideration and the PFAS revisions will be finalised, and what they will say. What was said at the GHGRP hearing: we did not watch the recording, and the rule’s docket on regulations.gov, EPA-HQ-OAR-2025-0186, held no transcript on 31 October 2026. We did not check state PFAS reporting laws, which run separately from TSCA, or other EPA programmes that cover PFAS, such as the Toxics Release Inventory. We re-check after the GHGRP comment period closes on 30 November 2026 and whenever either final rule is published.

    Software to evaluate for U.S. operations

    The list applies one published rule, the same for every product; it does not establish OSHA, EPA or state-plan outputs, which each vendor must demonstrate from sample data. No regional performance ranking is established.

    Tekmon pays for a sponsored placement (above); its place in this list follows the same rule as every entry. How lists are ordered

    Same rule for every product: tagged “EHS Management” or “Safety Management” or assigned primary category “EHS Management” or “Safety Management”, with a sourced incident management capability in its record, or one the vendor stated to us, labelled as vendor-stated. 57 qualify; the first 8 are shown, then the other 49.

    Need USA-specific QHSE software?

    Answer three questions for up to five suggested profiles based on catalog tags, then confirm USA requirements with each vendor in a demo.

    Get Matched

    Frequently Asked Questions

    Which EHS platforms automate OSHA 300/300A/301 logs?
    Some researched profiles document OSHA 300, 300A or 301 output in their capability records, each with its source and check date; open the profile before relying on it, because the forms covered and the plan required differ. Ask each vendor to generate the log and summary from a sample recordable case and to produce the ITA electronic submission file. Recordability decisions remain yours.
    Do I need a separate platform for OSHA PSM?
    Not necessarily. Ask the vendor to demonstrate the PHA, MOC, pre-startup review and mechanical-integrity records in the applications named in the quote, and how they link to incident investigation. Our research does not establish which operators run a dedicated process safety platform.
    How does the SEC climate rule affect EHS software selection?
    The SEC’s May 29, 2026 release describes the stay and proposes rescission of the 2024 rules. Verify subsequent action in the rulemaking file and distinguish other applicable disclosure duties or customer requests. This review establishes no market-wide adoption response.
    How do multi-state operators handle Cal/OSHA and other state plans?
    List the federal and state-plan rules that apply at each site, then ask each vendor who maintains its rule content and to show a changed requirement (for example a Cal/OSHA heat illness or IIPP check) reaching the relevant workflow. A vendor record shows what the vendor documents; it does not show that state content is maintained.
    Can U.S. EHS platforms handle Canadian and Mexican operations?
    Define the applicable Canadian federal or provincial requirements and Mexican requirements for each operation with the responsible team. Demonstrate those records, required languages and reporting handoffs; a US product capability does not establish coverage in another jurisdiction.
    What's the minimum viable U.S. EHS stack for a 200-person manufacturer?
    There is no standard stack. A starting list to test against your own obligations: incidents and OSHA recordkeeping, audits and inspections, job safety analysis and risk, training, contractor management, and SDS and chemical inventory. Ask each shortlisted vendor to demonstrate these modules and to quote the implementation plan.